跳到正文
认知
返回认知精选
认知精选AI论文大约 14 小时前
单一来源当前只有一个可用来源,尚未完成多源交叉核验

大模型评审机构中谁有权否决代理?

arXiv:2611.05390v1 Announce Type: new Abstract: Multi-agent language-model systems often add a reviewer to improve an upstream agent's decision. Yet a reviewer can both repair errors and replace decisions that were already correct. We study this as a problem of institutional jurisdiction: conditional on the same proposal, task information, model, and review output, when is the reviewer authorized to make its recommendation binding? We compare broad override authority with an evidence gate that permits replacement only after the reviewer produces a mechanically valid record of a binding-constraint violation and a compliant repair. Across two locally run open-weight models, 96 spatial-policy tasks, and a 96-task portfolio-transfer benchmark, the gate sharply reduces corruption of correct proposals while retaining most repairs of violations. The directions of this tradeoff are partly implied by the rule; its magnitude depends on reviewer transitions and upstream proposal states. A prospective validation then gives the reviewer an explicit choice to retain, replace, or escalate. This eliminates correct-proposal corruption for Qwen, but Mistral still replaces all 48 correct proposals; Qwen also declines every welfare-only repair that Mistral frequently attempts. Thus interface design changes reviewer behavior but is not a model-independent safeguard. The result is not that restricted review is universally better. It is that reviewer competence, action interface, and binding jurisdiction jointly determine both the correction domain and the corruption surface.

Evidence

来源与证据

单一来源 · 1 个信源

当前仅有一个可用来源,尚未完成多源交叉核验。

发布时间
内容处理
AI 翻译 / 摘要,需结合原文核对
内容有误或来源失效?告诉我们

每天早上收到这 5 条

免注册,填邮箱即可;每封邮件都能一键退订。

提交即表示同意按隐私说明保存你的邮箱,只用于发送简报。

或用 RSS 订阅

AI 翻译、摘要和解读仅用于辅助判断;涉及重要决策时,请回到上方来源核实。